FXSINO supplied internals for a large-scale FGD tower in Inner Mongolia

Figure 1: Field-erected FGD absorber at a carbon black production facility.

1. Project Background

This case study reviews an environmental upgrade for a major carbon black producer in the Qipanjing Industrial Park, Inner Mongolia. The project involved the retrofit and hardware supply for a wet flue gas desulfurization (FGD) system treating high-volume exhaust from production lines.

The centerpiece is a massive absorption tower with an internal diameter of approximately 15.8 meters, utilizing a bottom-inlet configuration.

2. Technical Challenges

Gas Distribution in Bottom-Inlet Configuration

With a bottom-inlet design, high-velocity flue gas enters the tower and must be evenly distributed across the entire cross-section (~196 m²) before contacting the slurry. Without proper flow management, wall abrasion and gas short-circuiting occur.

Structural Load Management

The scale requires robust support structures for the spray headers and demister modules. These components must withstand static loads (weight) and dynamic loads (slurry flow/pressure differentials).

3. FXSINO Scope: Complete Internal Hardware Package

For this project, FXSINO acted as the turnkey supplier for all internal static hardware. Our scope covered:

  • Gas Inlet Deflector & Flow Baffles: Custom-engineered turning vanes at the base to ensure uniform gas distribution and protect the tower walls.
  • Spray Header Support Beams: Heavy-duty structural steelwork designed to support the weight and thrust of the large-diameter slurry pipes.
  • Nozzle Supply & Configuration: Providing high-efficiency nozzles optimized for the specific liquid-to-gas ratio.
  • Demister Modules & Carrier Beams: Supply of multi-stage mist eliminators and the underlying support grid system.
  • Internal Platforms & Ladders: Access platforms within the tower for maintenance of nozzles and demisters.

4. On-Site Execution & Verification

During the installation phase, FXSINO technical personnel were present to oversee critical alignment stages. Key verification points included:

  • Levelness and plumbness of the spray header support beams.
  • Alignment of the gas inlet deflector relative to the tower centerline.
  • Elevation accuracy of the demister support beams to ensure proper sealing.

5. Conclusion

This project demonstrates the capability to engineer and supply complete internal hardware packages for mega-scale FGD absorbers. By focusing on structural integrity and precise gas-liquid contact dynamics, FXSINO provided a reliable solution tailored to the demanding environment of the carbon black industry.

© 2026 Jiangxi FXSINO Mass Transfer Technology Co., Ltd. All Rights Reserved.

lasciate un messaggio

lasciate un messaggio
Se sei interessato ai nostri prodotti e vuoi conoscere maggiori dettagli, lascia un messaggio qui, ti risponderemo il prima possibile.
invia

Casa

Prodotti

whatsApp

contatto